SP2 - Requirements Engineering
Title | Name | Confidentiality | Nature | Status |
Detailed Analysis Report on Requirements Engineering. | PR | R | accepted by JU | |
D_SP2_R1.2_M2 | Updated scope and requirements document for SP2 | RE | R | accepted by JU |
RE Language Definitions to formalize multi-criteria requirements V1 | PU | R | accepted by JU | |
RE Language Definitions to formalize multi-criteria requirements V2 | PU | R | accepted by JU | |
Improved Definition of RSL and RMM | PU | R | accepted by JU | |
D_SP2_R3.1_M1 | RE Process Framework Definition | RE | R | accepted by JU |
D_SP2_R3.2_M2 | Definition of Improved Requirements Engineering Methods | RE | R | accepted by JU |
D_SP2_R3.2_M2 Vol 1 | RE Process | RE | R | accepted by JU |
D_SP2_R3.2_M2 Vol2 | Requirements capturing - specification of improved methods | RE | R | accepted by JU |
D_SP2_R3.2_M2 Vol3 | Requirement / Traceability Management V2 | RE | R | accepted by JU |
D_SP2_R3.2_M2 Vol4 | Completeness / Consistency / Correctness V2 | RE | R | accepted by JU |
D_SP2_R3.2_M2_Vol5 | Processing of Requirements | RE | R | accepted by JU |
Revised definitions of improved RE methods | PU | R | accepted by JU | |
RE Process Framework Definition | PU | R | accepted by JU | |
Requirement Capturing Specification of Improved Methods | PU | R | accepted by JU | |
Requirement/Traceability Management | PU | R | accepted by JU | |
Completeness/Consistency/Correctness | PU | R | accepted by JU | |
Processing of Requirements | PU | R | accepted by JU | |
D_SP2_R4.1_M2 | First RE Toolset | RE | P | accepted by JU |
Second RE Toolset | PR | P | accepted by JU | |
D_SP2_R4.3_M4 | Improved and Optimized RE Toolset | RE | P | accepted by JU |
D_SP2_R5.1_M2 | Initial set of guidelines | RE | R | accepted by JU |
D_SP2_R5.2_M3 | Refined set of guidelines | RE | R | accepted by JU |
Improved and optimized guidelines | PU | R | accepted by JU | |
D_SP2_R6.1_M1 | RE Evaluation Basics | RE | R | accepted by JU |
D_SP2_R6.2_M2 | Assessment of Requirements Engineering Methods V1 | RE | R | accepted by JU |
D_SP2_R6.3_M3 | Assessment of Requirements Engineering Methods V2 | RE | R | accepted by JU |
Final Evaluation Report | PR | R | accepted by JU |
I_SP2_R2.1_M1 | Exemplified RSL and RMM | RE | R | accepted by JU |
I_SP2_R3.2_A | Requirement Capturing State of the Art Investigation | RE | R | accepted by JU |
I_SP2_R3.3-A | Requirement/Traceability Management | RE | R | accepted by JU |
I_SP2_R3.4-A | Completeness/Consistency/Correctness | RE | R | accepted by JU |
I_SP2_R6.1_M1 | Preliminary Evaluation Plan | RE | R | accepted by JU |
Confidentiality:
RE: Restricted, PU: Public, PR: Public Restricted (see process 4 exchange)